Canadian Coast Guard – Engineering Inspections of 13 Communication Towers
Tiller Engineering was responsible for detailed engineering and maintenance inspections of 13 CCG communication towers across Newfoundland.
-
St. Johns Port Authority – Terminal 1 Building Condition Assessment
Tiller was responsible for a condition inspection of the building envelope, structural portions, mechanical and electrical, etc., of the Oceanex Terminal 1 Building in downtown St. John’s.
-
St. John’s Harbour Wharf Condition Assessments Piers 6-11
Tiller Engineering conducts comprehensive structural inspections for St. John’s Port Authority, ensuring waterfront safety.
-
Bay of Islands Yacht Club
Tiller Engineering facilitated comprehensive site development, including feasibility studies and detailed design for Bay of Islands Yacht Club.
-
Bull Arm Modular Hall Structural Assessment
In 2024, our team conducted a thorough structural assessment of Bull Arm Modular Hall, ensuring safety and efficiency.
-
Substation Steel Design
Tiller performed detailed structural steel design for NL Power substations across Newfoundland & Labrador, including on-site oversight.