-
Structural Analysis, Site Audits and Construction Installation Packages
Client: Rogers in 2022-2023 Tiller was responsible for providing detailed structural analysis for the installation of new antenna systems to various sites. Furthermore, we were tasked with providing site audits and construction installation packages to ensure the construction antenna assets were installed to CSA safety standards.
-
Colombier Island Helipad and systems Refurbishment
Client: Fisheries and Oceans Canada In 2019 and 2020, Tiller Engineering was tasked with providing detailed design engineering and contract administration to light station(s) and helipads located at Colombier Island, which is a remote Island off the coast of Newfoundland & Labrador. The infrastructure needed refurbishment and repairs to address health and safety concerns … Continued
-
Relocation of the Helicopter Landing Pad on Ramea Island
Client: Fisheries and Oceans Canada Tiller Engineering was tasked with providing detailed design engineering, project management, contract administration for construction services, and structural assessments for the replacement of the DFO’s helicopter pad on the remote island of Ramea, on the south coast of Newfoundland & Labrador.
-
MUN Seawater Tanks Engineering Services and Inspections
Client: Memorial University of Newfoundland & Labrador Tiller Engineering was tasked to provide engineering and inspection services to the Memorial University of Newfoundland & Labrador’s Ocean Science Centre Seawater Tanks and subsequent structures and foundations. The client noted concerns of structural fatigue. These tanks are used for various research and education purposes by Memorial, … Continued
-
Bell Public Wireless Radio System Project (PWRS) – Bell Mobility
This multi-year contract will see a new state-of-the-art PWRS rolled across the province to provide a new communication platform for government emergency services and bring a safer level of interconnectivity across Newfoundland and Labrador. The project requires 125 new antenna installations across the island at various sites. When: 2022 – 2024 Where: Newfoundland and … Continued
-
Structural Inspection Services for Concrete Repairs on Memorial University Exterior Columns – Memorial University
Tiller completed Inspections of the Earth Science/Engineering building on the Memorial University campus to verify the construction progress of the parking garage and column repair. Tiller’s inspections helped clients ensure the concrete construction was completed safely.