In 2020, Tiller was tasked to complete. Non-destructive magnetic flux testing on all guy wires on the VHF tower at Robin Hood Bay with engineering reports. Tiller used robotic guy wire testing equipment to analyze guy wires and helped provide results of a full tower analysis to determine the existing guy utilization and reserve.
Cape Vine VHF Tower Guy Wire Tests – Department of Fisheries and Oceans
Engineering Lift Plans for Exhaust Stack at Voisey’s Bay - Rothlochston
Structural Inspection Services for Concrete Repairs on Memorial University Exterior Columns - Memorial University