In 2022, Tiller Engineering was tasked with the engineering of transmission tower lifts for Voltage Power. The structure type was a CBR Tower IFF – and Tiller helped compose the engineered drawings for crane lifting of the towers. Tiller worked closely with an array of stakeholders to in the construction phases to ensure a timely and safe lift of the transmission tower.