Tiller Engineering became an integral part of the installation of Bell’s latest cellular network. Hundreds of towers from Ontario east were inspected, analyzed with resulting scopes of work written for new antenna installations including any required reinforcing design. Tiller Engineering designed a unique antenna mount that was versatile and had to fit as many different towers as possible in the system while still meeting the requirements of the HSPA antennas and radios. The work was completed over approximately 14 months on time and on budget.