Tiller worked closely with Majors Contracting for a design-build of a salt storage building in Roddickton, NL for Roddickton Transportation Depot. The work completed included all design, labour, materials and equipment necessary to complete the installation. Tiller played a crucial role in this project as the engineering consultant to provide design services for the structure.
Design Build Replacement of Salt Storage Building
Design Installation of Remote Met Towers Across Coastal Labrador
White Hills Ski Lift Tower Inspections - White Hills Ski Resort