Engineering Inspection of 10 Communication Towers – Canadian Coast Guard
In March 2021, Tiller was awarded the Engineering Tower Inspection of ten (10) communication towers to CSA-S37-18 and the following was included in the Tiller Scope of Work: Inspections, Risk Assessment, and Reporting. When: 2021
-
Telecommunications Maintenance and Engineering Services – NSTIR
Tiller/VSI performed annual scheduled visual site inspections for each of the 61 towers that make up the Nova Scotia Integrated Mobile Radio Service (NSIMRS). Tiller continues a complete detailed tower inspection every three years as scheduled. A certified qualified engineer or CET performs this at each site location. When: 2022-present
-
Condition Assessments of Three Bridges for NL Hydro
Tiller Engineering was contacted to inspect the locations below to investigate the physical condition and structural conformance of three access road bridges concerning CSA-S6-06 (Canadian Highway Bridge Design Code) and other related industry standards. The scope of this assignment was divided into two (2) phases. The first phase of the scope of work was … Continued
-
Atlantic Canada Tower Inspections – Eastlink
Inspections of 17 Eastlink sites were completed in 2019 and 2020 with our partner Vertical Specialties (VSI). Inspections were completed to the latest requirements of CSA S37, and photos were recorded for the condition of the structures. Tower bolts were checked for proper torque, and vibration and fatigue testing was completed.
-
Building Condition Assessment of The Bier Markt – St. John’s Port Authority
Tiller Engineering was engaged by the St. John’s Port Authority to inspect the general condition of the visible sections of the building. A high-level visual inspection of the structural elements, mechanical and electrical building systems was performed. All assessments are based on the National Building Code of Canada, 2015. Reports were created to demonstrate recommendations … Continued
-
Structural Condition Inspections of Lower Churchill Girder Bridge – Pennecon
Pennecon engaged Tiller Engineering Inc. to inspect the structural condition of the visible sections of the bridge. This was requested from a due diligence perspective to confirm the bridge condition before the upcoming work on Rollways 2, 3 and 4 in June 2019. As part of this upcoming work, a Manitowoc 888 crawler crane will … Continued