Structural Condition Inspections of Lower Churchill Girder Bridge – Pennecon

Structural Condition Inspections of Lower Churchill Girder Bridge – Pennecon

Pennecon engaged Tiller Engineering Inc. to inspect the structural condition of the visible sections of the bridge. This was requested from a due diligence perspective to confirm the bridge condition before the upcoming work on Rollways 2, 3 and 4 in June 2019. As part of this upcoming work, a Manitowoc 888 crawler crane will be required to lift heavy equipment into rollways 2, 3 and 4.