Pennecon engaged Tiller Engineering Inc. to inspect the structural condition of the visible sections of the bridge. This was requested from a due diligence perspective to confirm the bridge condition before the upcoming work on Rollways 2, 3 and 4 in June 2019. As part of this upcoming work, a Manitowoc 888 crawler crane will be required to lift heavy equipment into rollways 2, 3 and 4.
Structural Condition Inspections of Lower Churchill Girder Bridge – Pennecon
Structural Inspection Services for Concrete Repairs on Memorial University Exterior Columns - Memorial University
Building Condition Assessment of The Bier Markt - St. John’s Port Authority